What are the safety requirements for building a charging pile?

The construction of charging piles can charge electric vehicles with energy. From the perspective of long-term development, it is very necessary to plan and construct professional charging piles in various parts of the city. However, the construction of charging piles must be considered. Safety requirements. Let’s take a look at the safety requirements for building a charging pile.

1, anti-collision requirements

When constructing the charging pile, it is necessary to consider the problem of collision avoidance. The corresponding vehicle limiter should be installed around the charging facility equipment to prevent multiple vehicles from being squeezed into the front of the charging pile at the same time. In addition, anti-collision columns should be installed. Equipment such as fences or anti-collision warning lights, and each charging device should be kept at a sufficient distance to ensure that there are no accidental impacts when there are multiple vehicles.

2, fire protection requirements

Because the content of the product provided in the charging pile is electric, and the electric power has certain danger, if the operation is inadvertent or improperly managed, it may cause an accident such as a fire. In order to prevent the occurrence of fire, the construction of the charging pile is carried out. At the same time, all kinds of components and materials must meet the relevant fire protection requirements in terms of combustion performance, fire resistance limit, etc. In addition, the distance between each charging pile must also meet the fireproof spacing.

3, waterproof requirements

If the charging pile encounters a fault such as a short circuit in the water, which causes a major safety accident, it is necessary to consider the waterproof problem when constructing the charging pile. The surrounding drainage system must not only be good but also maintain the normal for a long time. If it is a clear water ditch, then a water seal device should be installed when discharging. If there is no centralized drainage condition, then the rainwater on the ground should be dispersed as much as possible.

In order to enable everyone to safely use the charging pile to charge the vehicle, it is necessary not only to know where there are good quality and low price charging pile equipment, but also to fully consider anti-collision, fire prevention and waterproof in the construction process. Safety requirements ensure the safe operation of the charging piles and avoid various accidental dangers during use.

Related articles

Previous: The composition of the wire harness processing and how to carry out standard testing
Next: Application and market analysis of automotive wiring harness connectors
On-line
contact
message
download
Print
WeChat WeChat
Collection
TOP