Shanghai Richeng Electronics Co. Ltd - ISO9001/IATF16949/ISO/TS22163
Choose Language

Wiring duct,Cable Gland,Cable Tie,Terminals,RCCN

Technical transformation or replacement of wind turbines: difficult choices in the market after wind power

Recently, news about the post-wind power market continues to be released, and a tender for technological transformation has broken the long-stayed calm situation in the wind power technological reform market: Three Gorges New Energy Jiangsu Xiangshui 201MW Wind Farm Old Model Technical Transformation Project has been approved to purchase, Procurement of 27 wind turbine blades including blade equipment, pitch system reconstruction materials, blade reconstruction construction, equipment transportation, technical services and other projects, and replacement including but not limited to the wheel hub pitch motors, relays and other related facilities that meet reliable operation component.

Jiangsu Xiangshui Wind Farm is located in the eastern coastal area of Xiangshui County and belongs to the tidal flat landform unit of the Yellow Sea. It is equipped with 134 sets of FD77C wind turbines with a single unit capacity of 1.5MW (tower height 61.5m, blade diameter 77m) In 2010, all grid-connected power generation. There are two pieces of information disclosed here. One is that the running time is less than 10 years, and the core components have started to show problems; the other is that the batches have problems. In fact, this is not the first project to carry out mass transformation. Everyone who opens Baidu search will find countless news of technical transformation bidding and competition negotiations, but it is indeed rare for a project to conduct special technical transformation bidding in batches.



The traditional post-wind power market that everyone often discusses refers to the operation and maintenance market, but what I am discussing here is the post-technical reform market for wind farms. In fact, wind power technology reform is no longer a new topic. According to the author's rough estimate, there should be no fewer than dozens of companies engaged in this service (including professional operation and maintenance companies registered by the OEM). Some experts in the industry are very optimistic about this market, claiming a market size of 200 billion (personally believed to be the operation and maintenance market), I do not deny this, but the competition in the technological transformation market can be described as fierce, and not everyone can enter.

Related articles

Previous: The "charging pile" conjecture caused by the new infrastructure!
Next: National subsidy or full retreat 10%, some bus companies have internally implemented
On-line
contact
message
download
Print
WeChat WeChat
Collection
TOP